Showing posts with label Trusses. Show all posts
Showing posts with label Trusses. Show all posts

Sunday, January 10, 2016

Trusses and Roof Structure

Trusses and Roof Structure
Truss design plays an important role in the passive house envelope. Mainly to allow the high levels of insulation required, a very tall "heal" is required. We will need 24 inches of insulation in our entire attic - outside edge of outside wall to outside edge of outside wall. 


So here is our list of design characteristics: 
  • 24" heal height at outer wall
  • 24" over hang from outer wall
  • interior wall is load bearing
  • simple design (cost savings)
  • Flat ceiling

In order to meet the heal height requirement of 24" (and still leave space for attic ventilation) we need the roof pitch to be greater than 34 degrees. This led us to a 10/12 pitch on our roof - and the Grater Architects recommended it to us for aesthetics. And I must agree, it fits the house very well!

The trouble with such a large truss, is shipping limitations. The manufacturer (Morse Lumber) can only ship a maximum of 12 feet, so we had to do a "piggy back" truss on the top to finish off the triangle.

Truss Installation
Here are some photo's of truss day...
Let those trusses fly!
9 of the 22 trusses are in place!

Hungry? Grab a ....

This shows we will have 24" at the outside edge of the outside wall plus an inch or so of airspace for soffit ventilation.

We did have quite a fortuitous event occur with the truss installation. Due to scheduling and labor availability we decided to install the outer wall of the wall assembly before installing trusses. Our original plan was to fly trusses and then install the outer wall. This would have been a nightmare on the gable end walls.
If you look closely the completely sheathed  truss on the outside, is temporarily sitting on the outer (non load bearing) wall. If this wall was not there we would have had to cantilever it off of the load bearing truss OR paid to have a crane come back to lift 2 trusses another day. Building the outer wall 1st worked out much better!

So the load path once everything was nailed down and installed shows the inner truss over the interior wall is pushing down. The outer gable end truss (the will support the siding) is being pulled up by the over hang lumber (called the Rake Edge). The rake edge is nailed to the next most inner truss. I should say that this picture was taken before shimming and sheathing, and turned out very straight at the end.
Here you can see a hurricane tie attached to the outer truss to help "pull it up". This puts more load on the interior walls and reduced the weight on the outer wall.  

Next we installed our hurricane screws. Normally the strip seen in the picture above this is used to attached wall top plate to trusses. We opted to go with this screw for 2 reasons...
  • The screw doesn't create issues that directly compromise our continuous air barrier
  • It took a quarter of the time to install 1 screw than it did to install 10 nails and the strap

 When I asked our builder what he thought about the screw he said he'll never use the strap again, the savings in labor more than off sets the extra cost of the screw.

The south and north side of the house also has an over hang to shade the 2nd floor windows. Those were installed by hand and sheathed.
 We had to cut some of the gable end truss members to allow us to pass the south and north over hang "mini trusses" through the wall.
View of the south side
View of the north side


One of the most common questions I have received is "what type of roofing are you going to have?" Usually the expected answer is some kind of reflection shingle, solar electric shingles, or some other new technology. Fact is we are going with a plain black shingle. Nothing new here, just a black roof.


Here is what it looks like as of Jan 10th

Once the roof is finished we will be installing the zip system on the ceiling of the 2nd floor. After that we will be prepping for our 1st blower door test! Stay tuned!


Wednesday, December 16, 2015

Wall Assembly 2

Outer Wall Assembly
A lot has been happening! Since the last post we have...

Completed the Breezeway and Garage Foundation

Completed the Septic System 

Completed the Outer Wall Assembly (We'll refer to it as the Cladding Wall from now on)
(View of the Front and South Side)

(View of the Back)

(View of the North Side)

Needless to say we have turned a few heads. The most common question is where the windows are going or why are they covered up?


        Simply put, we are not just going to say we are building a super tight house, we are going to test it before any insulation, drywall, windows, plumbing, or electric is installed to ensure its tightness. And then after those other components are installed we can test again to check those individual components for air tightness. When we are ready to perform the initial blower door I will go into this into a little more detail. 

Lets take a look at the Cladding Wall Assembly and Details:
         

The Cladding Wall sits on the mud sill and extends upwards to the underside of the truss (just under 20 feet in total length). We did change the bottom plate from a 2x4 in the detail to a 2x6 to improve bearing on the concrete.  We did this "step" to allow for continuous insulation around the rim board.


           In a perfect world we wanted to wait to install the cladding wall until after the 1st blower door test but to keep the framing crew busy we decided to frame and install the cladding wall. We built the wall in "window sections" meaning we framed the full 2 story section on the ground to include only any 1st and 2nd floor windows and doors. However we are glad we installed the cladding wall before the trusses. The gable end truss will now have the cladding wall to sit on, and we don't have to "cantilever" the last 2 trusses off of the last common truss. It was also much easier to work from the top of the 2nd floor without trusses in the way.

We were able to lift the wall from the 2nd floor with a pulley and drop it in place. Once all of the window sections were placed we filled in the rest with 20 foot long 2x4's one at a time.

We did install blockers about 1/2 way up the cladding wall to provide stability and maintain spacing. 20 foot long 2x4's are not always the straightest.

The total thickness of the wall is 15.5" from outside face of cladding wall to inside face of structural wall. 


The space between the inner wall and the cladding wall is 7.5"

Here is a screen shot of the Passive House Planning Package (PHPP) calculation of our wall assembly:
This overall wall assembly, framing included, has an R-value of R-52. 

AND...
Trusses have been delivered
(House Trusses dropped next to a 40' storage container for perspective)
Another post will come shortly!